New customers who collected the same sample at a beauty counter and agreed to follow-up were randomly assigned by member ID. One group received an extra call on day seven. Count each member’s first full-size purchase at the counter or in the mini program within 30 days, then allow 14 days for refunds, including returns to a different store.
| Measure | Usual service | Extra call |
| Customers assigned | 400 | 400 |
|---|
| Full-size buyers | 48 | 60 |
|---|
| Purchase rate | 12% | 15% |
|---|
| Contribution before calls (CNY) | 2,400 | 3,000 |
|---|
| Extra call costs (CNY) | 0 | 600 |
|---|
CNY 0 net gain
At CNY 50 contribution per buyer, the 12 extra buyers generated CNY 600. The extra calls cost CNY 600. Conversion rose three percentage points, but the pilot broke even.
The membership lead tests a less costly follow-up with a small group. Review contribution per assigned member, opt-outs and complaints before expanding. An order placed online and collected at the counter counts once.
Both stores started the week with zero units of the same fruit cup. Walk-in shoppers, mobile pickups and local deliveries draw on each store’s stock. Reconcile receipts, picking and handovers by order and fulfilment store. Track unfilled reservations separately.
| Units | Store A | Store B |
| Received | 420 | 280 |
|---|
| Sold | 350 | 266 |
|---|
| Written off | 56 | 7 |
|---|
| Closing stock | 14 | 7 |
|---|
| Unfilled reservations | 4 | 28 |
|---|
28 reservations unfilled at B
A wrote off 56 of 420 units received (13.3%). At B, 7 of 280 were written off (2.5%), yet weekend evening orders went unfilled. A weekly stock total hides the timing of the shortage.
For two weekends, try a smaller initial allocation at A and use afternoon reservations and available stock to decide whether B needs an extra delivery. Check pickup readiness and delivery punctuality, then compare write-offs, shortage refunds and extra transport costs.
In one city and month, households booked a home visit online and the store assigned a designer. Match each reservation to the completed measurement, design proposal and first contract payment. Deduplicate by household and follow each channel for 30 days.
| Measure | Livestream | Local partners |
| Households booked | 120 | 60 |
|---|
| Completed measurements | 30 | 30 |
|---|
| Design proposals | 24 | 27 |
|---|
| Paid contracts | 6 | 9 |
|---|
| Channel cost (CNY) | 6,000 | 3,000 |
|---|
CNY 200 vs 100 per completed visit
The two channels each delivered 30 completed measurements. CNY 6,000 ÷ 30 gives CNY 200 per livestream visit, compared with CNY 3,000 ÷ 30 for local partners.
Show eligible addresses and available visits on the booking page. Track on-time visits, cost per completed measurement and designer hours before changing staffing. For signed contracts, check factory lead times and whether delivery and installation meet the promised dates.